R 37 weights of parts and fittings | ||
lbs | ||
Main transverse frames (without wires) | 7,420 | |
Intermediate transverse frames | 2,400 | |
Main longitudinal girders (with joints) | 7,080 | |
Intermediate longitudinas (with joints) | 3,920 | |
Transverse wiring of main frames | 1,950 | |
Hull and corridor diagonal wiring | 1,500 | |
Circumferential wiring | 1,100 | |
Corridor | 3,080 | |
Tail structure (complete) | 380 | |
Bow morring structure and gear | 700 | |
Fins with wiring (complete) | 1,400 | |
Rudders and elevators | 1,050 | |
Crew's quarters flooring | 240 | |
Climbing shaft and ladder | 135 | |
Transverse walking way to wing power cars | 180 | |
Walking way on top of ship | 480 | |
Protection in wake of propellors | 225 | |
Manoeuvring valaves and stowage | 260 | |
Automatic gas valves and stowage | 730 | |
Forward power car with suspensions | 3,600 | |
Midship power cars (2) | 7,200 | |
Aft power car | 3,600 | |
Control car | 1,500 | |
Electrical gear | 700 | |
Wireless gear | 250 | |
Gasbags with fittings | 10,500 | |
Outer cover with lacing strip and cord | 4,900 | |
Voice pipes | 60 | |
Trap hatches to power cars | 30 | |
Trap hatches for ropes | 70 | |
Winch cable and sea anchor | 120 | |
Mooring ropes | 50 | |
Handling ropes | 100 | |
Axial wire | 80 | |
Framework for emergency water ballast bags | 160 | |
Petrol tank stowage | 600 | |
Petrol tank (each) | 30 | |
Rudder and elevator controls | 800 | |
Gas and water ballast controls | 250 | |
Petrol piping and fittings (complete) | 700 | |
Instruments | 180 | |
Water ballast bag with valve | 10 | |